The Canadian Press
2015-11-02 | Saskatchewan Carbon Capture
Preview Clip
$149.00
An overhaul is about to be completed at the 1.5-billion dollar carbon capture facility at the Boundary Dam power plant near Estevan. SaskPower CEO Mike Marsh says the facility is coming back online and it will be fully operational, even if it's not operating full time. (Documents leaked to the NDP show the facility has been working 45 per cent of the time and that SaskPower had to pay 12 million dollars in penalties to an energy company for failing to deliver enough captured carbon dioxide.)
Date: 2015-11-02
Placeline: REGINA.
Source: The Canadian Press
Length: 15 seconds
Transcript Prediction: << it means we're capturing man we will we will run that plants where we need to run it we will run at a half load we will bring it up to full load we will drop it back here we're going to run it through all kinds of operating resumes that's what we do only operational means the plant is now running >>
Date: 2015-11-02
Placeline: REGINA.
Source: The Canadian Press
Length: 15 seconds
Transcript Prediction: << it means we're capturing man we will we will run that plants where we need to run it we will run at a half load we will bring it up to full load we will drop it back here we're going to run it through all kinds of operating resumes that's what we do only operational means the plant is now running >>
Earbank_2015-11-02_Saskatchewan-Carbon-Capture_3527